3 The street light switch has been connected, and a 6-way scene switch is installed next to it. Does it just need to be connected to the zero live wire?
How do I bind keys of a compound scene switch to specific scenes?
During MCU integration, how do I use the Zigbee scene switch to trigger a scene?
How to detect whether the Zigbee device supports scene switch linkage?
Zigbee scene switch reset long press time?
How to configure the Wi-Fi scene switch?
What is the number of seconds to hold the Wi-Fi scene switch reset?
MCU solution Zigbee scene switch cannot be triggered according to protocol development?
Why doesn’t the scene panel send commands to the MCU when I press the button on the App side?